With 120K on the origianal bushings, I am having all the important ones replaced with "Powerflex" street bushings. I'm told that without "The Tool" the RTAB could take as long as 10 m/h to complete....
Type: Posts; User: bkolnz; Keyword(s):
With 120K on the origianal bushings, I am having all the important ones replaced with "Powerflex" street bushings. I'm told that without "The Tool" the RTAB could take as long as 10 m/h to complete....